Multidisciplinary review of tube failure likelihood (CCPS GPREH2 trim)

Welcome to Inglenook's blog, Fireside Chats. Our goal for the blog is to address topics that may not be encountered everyday, but do deserve some consideration during efforts to ensure facilities are operating safely.  Many "fireside chats" have led to great ideas, improvements, and opportunities.  We hope these do too.

Wednesday, June 24, 2026

The Tube failure characterization (CCPS GPREH2 trim) closed with the nine ISO 23251:2008 aspects that bear on the likely failure mode.1 The following evaluation criteria are recommended to help determine the effects that those aspects…

Read More »
Wednesday, June 24, 2026

Tube failure in a shell-and-tube heat exchanger is the common structural-failure basis for overpressure protection.1 Before the relief load can be sized, the designer has to decide what kind of failure to design for. The…

Read More »
Monday, March 27, 2017

There are multiple sources of vibration in piping that can lead to failures, usually occurring at welds, penetrations, or other ‘discontinuities’.  The EI Guidelines for the Avoidance of Vibration Induced Fatigue Failure in Process Pipework1…

Read More »
Monday, November 21, 2016

The Center for Chemical Process Safety (CCPS) defines process safety time as “the time period between a failure occurring in the process or its control system and the occurrence of the hazardous event.”1  Process safety…

Read More »